EN
UK Talk to us ↗
Blog / Insight · November 2026 · By Nick Taylor

ECO4 ends on 31 December: what it means for solar installers

Short answer: ECO4 ends on 31 December 2026 and there is no ECO5. The nine-month extension only lets energy suppliers finish existing targets, so no new volume is coming. From 2027, funded solar for low-income homes moves to the Warm Homes Plan, run mainly through councils and social landlords. The next five weeks are about finishing cleanly.

The key dates

The government's response on extending ECO4 confirmed there are no new targets, no successor scheme and no new Innovation Measures. Uplifts already awarded, such as Archai's IM045, are honoured until the scheme closes.

DateWhat happens
31 March 2026GBIS ended. Last date for new Innovation Measure applications
31 December 2026ECO4 ends
2026/27Warm Homes: Local Grant and Social Housing Fund keep delivering
From 2027/28Low-income grants expected to move into a single scheme

Finish what you can

Your real deadline is probably earlier than the 31st, because suppliers have to evidence and notify each measure. Ask whoever you deliver ECO4 through for their cut-off date, then sort your pipeline:

Job stage todayWhat to do
Installed, paperwork incompleteFinish the MCS certificate, handover pack and photos this week
Surveyed, materials in stockBook scaffold and install now, leaving room for weather
Surveyed, not designed or orderedCheck with the scheme manager whether it can still count
Lead onlyTell the customer plainly and note them for Warm Homes funding

Don't rush it. Inspections are stricter, and a December job that fails one costs more than a job you didn't take.

Where the work goes next

The Warm Homes Plan puts just under £15 billion into home upgrades this parliament, including £5 billion for low-income households that can fully fund solar and a battery, and low-interest loans for everyone else. The buyer for low-income solar is increasingly a council or housing association, buying through frameworks and tenders.

That work tends to land on harder roofs: terraces with chimneys and dormers, and split east/west arrays. Panel-level optimisers stop one shaded panel pulling down the string. In our Stockport side-by-side test, the optimised string produced 10% more with one panel shaded. Landlords also need to spot a failed panel without a site visit, which Archai's monitoring over the DC cable handles without tenant Wi-Fi. Archai is certified with Solis and confirmed compatible by Fox ESS, so there's no need to change inverters.

Building for what comes next

We're developing our next generation of products with this market in mind. Councils and housing providers buying solar at scale will expect more than extra yield. They'll want evidence of what was fitted and how it's performing, oversight across many homes, and a price that works at volume. That's the brief we're designing to.

If you deliver council, housing association or Warm Homes work, we'd like to hear what matters on your roofs. Tell us, and help shape what we build.

Frequently asked questions

When does ECO4 end? On 31 December 2026, after a nine-month extension.

Is there an ECO5? No. The government has said there will be no successor supplier obligation.

Will the Warm Homes Plan fund solar? Yes, through grants for low-income households and government-backed loans for others.

Get ready for 2027

If you're planning next year's funded work, talk to us about a specific job or join the partner programme for design support and training.

Archai Power

Spec Archai on your next job

Datasheets, trade pricing and compatibility checks for installers and distributors.

Next step

Spec it on your next job.

Datasheets, trade pricing and compatibility checks for installers, distributors and inverter manufacturers.