Solar optimisers for Fox ESS single-phase inverters.

Fox ESS has confirmed Archai's compatibility with its single-phase H1-G2, KH and EVO inverters. Keep the Fox ESS inverter you already fit, add one iOPT 800W optimiser per panel and one GT gateway per string, and you get panel-level MPPT, per-panel monitoring in SolarSync and rapid shutdown to about 1 V at every panel.

Confirmed by Fox ESS, single-phase.

Tested by Fox's own technical team: normal operation, start-up and MPPT interaction, with no abnormalities found. We'd rather be exact about the scope than round it up.

Fox ESS logo
✓ Confirmed
● Compatibility confirmed

Fox ESS

Scope
Single-phase H1-G2 (incl. H1-G2-WL) · KH · EVO5 · EVO10
Status
Fox ESS UK compatibility statement, Rev 1.0 (PDF)
Warranty
Fox says using Archai within the inverter's limits doesn't in itself affect the Fox warranty
Three-phase
Not covered yet. Ask us

Design rules on a Fox ESS job.

Design the string to the Fox ESS inverter exactly as you do now, using the panel datasheet and the Fox ESS datasheet. Then add four checks.

  • One iOPT 800W per panel. Every panel in the string gets an optimiser.
  • One GT gateway per string, up to 30 optimisers.
  • Every panel inside the optimiser's input limits (table).
  • A confirmed inverter. Fox ESS single-phase H1-G2, KH or EVO. Three-phase, or any other Fox model: send us the design first.

The inverter-side checks (string voltage window, MPPT inputs, DC isolation) are the same as without optimisers.

iOPT 800W input limits
Max input power800 W
Max input voltage70 V (check panel Voc)
Max input short-circuit current23 A (check panel Isc)
MPPT range12–60 V
Max system voltage1500 V

Worked example: one string on a Fox ESS hybrid.

14 × 450 W panels (Voc 49.5 V, Isc 13.9 A) wired as a single string on a Fox ESS single-phase hybrid. The panel figures are an example: use the datasheet for the panel you're fitting.

Check each panel against the optimiser
Power450 W against 800 W max ✓
Voltage (Voc)49.5 V against 70 V max ✓
Current (Isc)13.9 A against 23 A max ✓
InverterFox ESS single-phase, confirmed by Fox ✓
Bill of materials: 14 × iOPT 800W and 1 × GT gateway.

Two strings? Then two GTs, one per string. 22 panels split into two strings of 11 is 22 × iOPT 800W and 2 × GT.

Send us the design first if the string is close to 30 optimisers, mixes panel models, uses a panel with Isc close to 23 A, or is on a Fox ESS model you haven't fitted with Archai before.

The full method is in designing a string with optimisers.

Installation and commissioning notes.

With the inverter DC switch off and the array disconnected. Fitting: IN first, then OUT. Removing: OUT first, then IN.

01 / FIT

Clip, label, connect

Clip an optimiser behind each panel, stick its serial label on the layout sheet, connect the panel to IN+ and IN−.

02 / CHAIN

OUT to OUT

OUT+ of each optimiser to OUT− of the next. Push each Stäubli MC4 home until it clicks, then tug-test. Never mix connector brands.

03 / GT

Gateway near the inverter

Last OUT+ to the inverter PV+. First OUT− through the GT's magnetic ring to PV−. GT AC lead to a 90–264 V supply via an MCB.

04 / TEST

The 1 V test

About 1 V at each optimiser, about 1 V × panels on the string. Our 14-panel example reads about 14 V before the GT is live.

Readings before the GT is live
0.9–1.1 V at one optimiserNormal
Above 1.1 VFaulty optimiser: replace
Below 0.9 VCheck light, then IN wiring; still low: replace
About −1 VMeter probes reversed
String higher than expectedA panel wired straight into the string, or extra optimisers
String lower than expectedAn IN or OUT not connected, or an OUT reversed
String reads 0 VOpen circuit, or cable on the wrong string

Then power up. Turn the inverter DC switch on and power the GT: the Power and Running lights come on. Press the GT button once; after 5 seconds, press and hold until lights 2–4 flash, then release. Wait about 10 minutes: a flashing Running light means the self-test passed. Press once more so Running stays on. If it fails three times, stop and call our technical support team.

Label the GT's MCB. Removing the GT's AC supply puts every optimiser into rapid shutdown.

Map in SolarSync (Layout, Add, then row and column from your layout sheet). The inverter and battery are monitored in Fox ESS's own platform as usual.

Step-by-step photos: quick install guide (PDF).

Fox ESS questions.

Can you fit optimisers to a Fox ESS inverter?

Yes, on Fox ESS single-phase H1-G2 (including H1-G2-WL), KH, EVO5 and EVO10 inverters. Fox ESS UK has tested Archai optimisers with those ranges and confirmed compatibility in a statement issued in November 2026.

Are Fox ESS three-phase inverters covered?

Not yet. Three-phase testing is ongoing. If you have a three-phase Fox ESS job coming up, ask us and we'll tell you exactly where it stands before you quote.

How many GT gateways do I need?

One GT per string, up to 30 optimisers each. A single string needs one GT; two strings need two.

Why does the string read so low before commissioning?

Each optimiser holds about 1 V until the GT is live, so a 14-panel string reads about 14 V. That's normal: the inverter starts once the GT brings the optimisers out of the safe state.

Do optimisers affect the battery on a Fox ESS hybrid?

The optimisers sit on the DC side between the panels and the inverter's PV input. The battery connects to the inverter separately, so it is wired and set up as normal.

Next step

Spec it on your next job.

Datasheets, trade pricing and compatibility checks for installers, distributors and inverter manufacturers.